The following City of Mesa Capital Improvement Projects are
current and are being constructed around the City of Mesa. These projects involve the
widening of our existing arterial street system; intersection improvements;
adding new roadways; landscaping within public right-of-way; street lighting and
traffic signal system improvements.
Technical Services
Building (Project No. 01-258-001)
Baseline
Wastewater Interceptor Siphon Inlet and Outlet
Structure Rehabilitation (Project No. 03-083-001)
City Well
# 12 - Equipping Phase (Project No. 05-056-002)
South C.A.P.
Reservoir and Booster Pump Station (Project No. 01-600-001)
2007/2008
Residential
Street Overlays (Project No. 06-044-002)
2007/2008 Street
Improvements - McKellips Road from Gilbert Road to
Val Vista Drive, and Recker Road from Adobe To
McKellips Road (Project No. 06-044-003)
2007/2008 Arterial
& Collector Street Overlays, Phase 2 (Project No.
06-044-004)
2008/2009
Residential Street Overlays - Phase 2 (Project No.
06-044-005)
Municipal Court
Building (Project No. 01-850-001)
30-inch Potable
Water Transmission-McKellips Road from Val Vista
Drive to Higley Road (Project No. 06-055-001)
Cured-In-Place
Wastewater Pipe Lining
(Project No. 04-858-001)